Plan the human rollout of an AI tool or workflow to an organisation — sized cohorts, enablement per cohort, named champions, a comms plan that states what will not change, and an adoption gate every wave must pass before the next one opens. Use when a tool has been chosen and the question is how it reaches people without stalling or backlash. Do NOT use to phase a technical cutover (that's migration-plan) or to choose which use case to roll out (that's ai-use-case-triage).

Pack ai-engineeringTier standardJob Govern AI usev0.1.0

npx skilldrop-cli install ai-adoption-rollout
Other ways to install

With the sibling skills it hands off to:

npx skilldrop-cli install ai-adoption-rollout --with-related

The whole pack it belongs to:

npx skilldrop-cli install --pack ai-engineering

By hand, from a clone of the repo:

cp -R packs/ai-engineering/skills/ai-adoption-rollout ~/.claude/skills/

In Claude Code, with the ai-engineering plugin installed, invoke it as:

/ai-engineering:ai-adoption-rollout

Try it

A realistic prompt from the skill's acceptance evals:

We've picked an AI assistant for our 300-person support org. Plan the rollout.

What a good result looks like

How it's checked

Measured against plain Claude Code (2026-10-23): it met 73% of its checks, against 48% without it, and a blind judge preferred it. How skills are checked

22 assertions across 3 acceptance evals, and 8 trigger queries. Every skill's checks

What the output must do
  • Cohorts are sized smallest-first (pilot, early, general) with a stated reason each cohort is next
  • A single big-bang wave is explicitly refused
  • Every wave has an adoption gate with an observable, a threshold, and a bake time, plus a rollback if the gate fails
  • The adoption outcome is stated as a behaviour rather than a usage or licence number
  • The comms plan explicitly states what will not change regarding headcount, evaluation, or how work is judged
  • Champions are named as roles with protected hours
  • Enablement differs per cohort and is hands-on with the participant's own work
  • A friction loop names an owner and a cadence
  • It shows that all 1,400 nurses by 1 December cannot be met with 4 educators training 25 nurses each per week (about 14 weeks of training, plus the 21 December to 3 January freeze), says so plainly, and proposes a realistic date or a smaller first scope
  • It builds in at least 30 days' written notice and consultation with the union before nurses outside the pilot go live
  • It does not present the 52-minutes-per-shift saving as established, noting that it comes from 11 questionnaire responses out of 60 pilot nurses
  • It holds back areas with the Wi-Fi dead spots (Ward 7 bays C and D, at least on nights) until the connectivity problem is fixed, or makes going live there conditional on the fix
  • Its staff messages state the CNO's commitments (no use in performance management, no staffing reductions, nurses review every note) and do not add commitments the CNO did not make
  • It does not invent figures, dates, names or results that are not in the files
  • It is no longer than two pages
  • It gives a plan in this reply rather than asking questions first
  • It starts with a smaller group, such as the keen volunteers, before everyone, rather than all 22 teachers at once
  • It deals with the teachers who are against it by hearing their objections, without forcing them or singling them out
  • It suggests the head tells staff plainly what will not change, for example that teachers stay responsible for their plans or that the tool will not be used to judge them
  • It includes a check before widening, saying how the head will know whether the first group found it useful
  • It does not invent features of the tool, a product name or survey figures
  • It is about half a page (roughly 300 words or fewer)
When it should and shouldn't activate

Should activate:

  • Plan how we roll this AI tool out to the org
  • How do we drive adoption without a backlash?
  • Design the cohorts and enablement for our AI launch
  • Our last AI rollout decayed after launch — plan the retry

Should leave to another skill:

  • Plan the phased migration of our database schema
  • Which use case should we roll out first?
  • Write the rules for what people can put into these tools
  • Report on how much AI our team is using