Use risk-register
Build or update an enterprise or project risk register
Build or update an enterprise or project risk register — each risk written as cause, event and consequence, scored for likelihood and impact on a defined scale, inherent and residual ratings, a named owner, a treatment (avoid, reduce, transfer, accept), controls, a due date and a review trigger — with a heat map, the top risks that need a decision, and a stdlib script that validates the register CSV and flags overdue reviews.
Reach for it when the user wants a risk register, a risk log, a RAID log's risk section, a heat map, or says "what are our top risks", "update the risk register", "score these risks".
Install it
npx skilldrop-cli install risk-register # Claude Code, your user folder
npx skilldrop-cli install risk-register --project # Claude Code, this repo
npx skilldrop-cli install risk-register --ide cursor # or kiro, codex, antigravity, copilot
It is part of the Governance, risk and compliance pack: --pack grc installs it with its neighbours.
It ships scripts, so it needs Python 3 (standard library only, nothing to install). What they may touch is declared in its manifest.
Ask for it
Say it the way you would to a colleague. Requests like these route to it:
- "Build a risk register for our office move programme"
- "Here's our risk log CSV, check it for missing owners and overdue reviews"
- "Score these eight risks for likelihood and impact and give me a heat map for the board"
- "What are our top risks this quarter and which need a decision from the exec team?"
Requests like these belong to a different skill, so it shouldn't answer them:
- "Run a STRIDE threat model on our payments API design"
- "Do a DPIA for our new employee monitoring tool"
- "Map our controls to SOC 2 criteria and list the evidence the auditor will ask for"
If another skill answers instead, ask for this one by name: "use risk-register".
Check what you get
A good result:
- Every risk has a cause, an event and a consequence, each a sentence. No one-word risks.
- The scale is written down in the output, with what each number means.
- Inherent and residual are both scored, and residual counts only controls in place today.
- Every open risk has a named owner (a person or a role a person holds) and a next review date.
- Every treatment has an action and a date, except
accept, which names who accepted it. - The script passes with zero errors before the register is shown, and its heat map is pasted, not redrawn by hand.
- The decision list is short: five or fewer, each naming the decision and the decider.
See a worked example
Use something else when
- Security threats against a specific system design, by STRIDE: use
threat-model - Threats specific to an AI agent's tools, prompts and data: use
agent-threat-model - Risks to individuals from processing personal data: use
dpia, which scores harm to people, not to the company - Mapping controls to SOC 2 criteria and audit evidence: use
soc2-evidence-map - Recording a decision once it has been made: use
decision-log - Setting quality targets such as availability or latency: use
nfr-spec
Where a loop runs it
- Stage
registerof thecomplyloop - Stage
checkof thecomplyloop, where gate G8 decides